Wednesday, November 20, 2013

Foundation and Floor

Poured foundation and floor of casita today.  They will be back tomorrow to pour porch floor.

Monday, November 18, 2013

Foundation

Foundation dug, water line relocated and electric line in.


Finished for the day.

Saturday, November 16, 2013

Working on the Furniture

Hal sanding pieces of the chairs.


I have been painting the chairs.  These go in the casita, so all will be Mexican style.

Monday, November 11, 2013

Panama Hat

We found this for Hal while in Mexico Saturday.

Tuesday, November 5, 2013

Start of Casita Build

Getting forms set and putting in underground plumbing.



Friday, November 1, 2013

Back in Yuma

Sorry no pictures.  We have been in Yuma since Monday noon, but have been very busy.  We had to move both of our sheds, the small one is going to  a couple from Canada along with the washer and dryer.  The large one just needed to be moved so the casita can be built.  We used roller system, steel round pipe cut into pieces between two 2x4s.  It worked great.  We borrowed heavy jacks to raise shed, then moved it.  It is still up on blocks, as we need to spray for bugs before we lower it onto the pavers.  
The builder came Wednesday to check in with us, returned today to stake it out, then someone came to move gravel off the site.  Monday they start with drenching for electrical , water, and sewer.  Will post pics then.